Home / Projects / Industrial

Case study 3 · Selangor

UMW High Value Manufacturing, Serendah

Full quantity surveying for five UMW facilities at the High Value Manufacturing Park, Serendah: from office building to industrial operations.

ClientUMW
LocationSerendah, Selangor
SectorIndustrial & corporate
DCC roleFull quantity surveying services
ScopeFive facilities: from guard house to five-storey office building and factory floor

Overview

One client, from office to factory floor.

The UMW High Value Manufacturing (HVM) Park in Serendah is an 861-acre industrial park, developed by UMW as Malaysia's first high-value manufacturing park. UMW relocated group operations from Shah Alam to new facilities within the park.

DCC was appointed to provide full quantity surveying services across five of these facilities. Each building type carried different cost drivers, from office fit-out to heavy industrial operations, and each was carried through every stage of the QS appointment.

The QS appointment

Full QS, from first estimate to final account.

01Cost estimates and cost plans

Budgets set for each facility and revised as the designs developed.

02Bills of quantities and tender documents

Each building measured and documented for competitive tender.

03Tender reports and contract documents

Tenders evaluated and recommended, and contracts prepared.

04Interim valuations and variations

Work in progress valued and variations measured through construction.

05Final accounts

The final cost of the works agreed for each facility.

The facilities

Five facilities, one cost discipline.

FacilityTypePrincipal cost drivers
Office buildingFive-storey office blockStructure, façade, building services and fit-out
Heavy equipmentIndustrial facilityHeavy-duty structure, floor slabs and hardstanding for equipment
Industrial powerIndustrial facilityElectrical loads, power distribution and plant support
UMW IndustriesIndustrial facilityProduction space, process services and utilities
Guard houseAncillary buildingControlled access, security systems and external works

Talk to us about a project like this.

Contact us